9
9
9-77
9-77
Installation > Drum Heater-C1 Installation Procedure > Installation Procedure
Installation > Drum Heater-C1 Installation Procedure > Installation Procedure
16) Draw out the paper cassette(s).
17) Remove the left cover (lower).
*For the model with the 1st cassette capacity is 550sheets:
Screws (2 pcs.)
•
*For the model with the 1st cassette capacity is 250sheets:
Screws (3 pcs.)
Claw (1 pc.)
•
•
x2
Claw
x3
F-9-179
F-9-180
18) Remove 1 screw from the left cover and distort it to detach the inner bottom cover.
Screw (1 pc.)
x1
•
F-9-181
Содержание IMAGERUNNER 2530
Страница 1: ...9 8 7 6 5 4 3 2 1 imageRUNNER 2530 2525 2520 Series Service Manual...
Страница 4: ...Blank Page...
Страница 16: ...1 1 Product Overview Product Overview Product Lineup Feature Specifications Name of Parts...
Страница 111: ...3 3 Periodical Service Periodical Service Consumable Parts and Cleaning Parts...
Страница 159: ...5 5 Adjustment Adjustment Outline Adjustment when replacing parts Image position adjustment...
Страница 166: ...6 6 Troubleshooting Troubleshooting Upgrading Targets and Procedure...
Страница 171: ...7 7 Error Code Error Code Overview Error Code Jam Code Alarm Code...
Страница 186: ...8 8 Service Mode Service Mode Outline Details of Service Mode...
Страница 321: ...Service Tools General Circuit Diagram Appendix...