
Having an OCS system requires that your tractor
be equipped with at least five remotes. Three
are required to operate your Off-load Conveyor
System. One is used for each of the following
operations.
•
Position the conveyor in the offloading position.
•
Operate the unloading augers and conveyor.
•
Raise the basket for clean out and
maintenance.
For proper peanut flow:
Using the Conveyor
NOTICE
An OCS system equipped M2120A will
not function properly unless your tractor’s
hydraulic pump capacity is at least 35
GPM @ 2500 PSI.
Maximum harvesting performance requires at
least 40 GPM @ 2500 PSI pump flow.
NOTICE
Do NOT exceed a rate of 20 gallons/minute
hydraulic flow to the OCS system.
•
Make sure the shaft speed remains consistent
at 250 RPM. Higher speeds result in shelling
and can damage hydraulic motor seals.
•
If possible, make sure the return line is
connected to the direct-to-tank port.
•
If properly set peanut flow is as follows:
Charging the OCS Hydraulics
Escaping fluid or spray under pressure
can penetrate the skin causing serious
injury.
•
Read “Avoid High Pressure Fluids” in
Chapter 1.
Safety
.
•
Relieve pressure before disconnecting
hydraulic lines.
•
Tighten all connections before applying
hydraulic or spray pressure.
•
Use the Hose ID Chart to identify
hydraulic hose connections.
1. Refer to the safety information at the
beginning of this chapter when operating
your conveyor.
2. Connect the OCS hydraulic hoses to your
tractor hydraulics.
3. Operate the remote for the swing out cylinder
until all air has been removed from the
system.
4. Put the conveyor in the storage position.
5. Check your tractor’s hydraulic oil level.
6. Fill to required level if necessary.
Discharged
Peanuts
Approx.
2-1/2 Ft
WARNING
!
Off-Loading Conveyor System
M2120A PT Peanut Combine
4/24/19
MAN152
56
Содержание M2120A
Страница 14: ...NOTES Introduction M2120A PT Peanut Combine 11 2 18 MAN152 xii...
Страница 35: ...NOTES 4 24 19 Safety M2120A PT Peanut Combine MAN152 21...
Страница 36: ...This page left blank intentionally Preparation M2120A PT Peanut Combine 4 24 19 MAN152 22...
Страница 42: ...NOTES Saftey M2120A PT Peanut Combine 4 24 19 MAN152 28...
Страница 65: ...NOTES 4 26 19 Operation M2120A PT Peanut Combine MAN152 51...
Страница 66: ...Off Loading Conveyor System M2120A PT Peanut Combine 4 24 19 MAN152 52...
Страница 78: ...NOTES Off Loading Conveyor System M2120A PT Peanut Combine 4 24 19 MAN152 64...
Страница 80: ...This page left blank intentionally Controls and Adjustments M2120A PT Peanut Combine 4 24 19 MAN152 66...
Страница 93: ...NOTES 4 24 19 Controls and Adjustments M2120A PT Peanut Combine MAN152 79...
Страница 94: ...This page left blank intentionally Controls and Adjustments M2120A PT Peanut Combine 4 24 19 MAN152 80...
Страница 103: ...NOTES 4 24 19 Performance M2120A PT Peanut Combine MAN152 89...
Страница 104: ...This page left blank intentionally Performance M2120A PT Peanut Combine 4 24 19 MAN152 90...
Страница 106: ...This page left blank intentionally Maintenance M2120A PT Peanut Combine 4 24 19 MAN152 92...
Страница 115: ...NOTES 4 24 19 Maintenance M2120A PT Peanut Combine MAN152 101...
Страница 116: ...This page left intentionally blank Maintenance M2120A PT Peanut Combine 4 24 19 MAN152 102...
Страница 125: ...NOTES 4 24 19 Peanut Tech M2120A PT Peanut Combine MAN152 111...
Страница 126: ...This page left blank intentionally Peanut Tech M2120A PT Peanut Combine 4 24 19 MAN152 112...
Страница 129: ...NOTES 4 24 19 Appendix A M2120A PT Peanut Combine MAN152 115...