
1. The header pickup (1) lifts the dug & windrowed
peanuts and vines off of the ground. The header
auger (2) feeds them into the picking cylinders (3).
2. The picking cylinders strip the peanuts from the
vines. Large amounts of dirt and foreign material
are removed by the high-capacity cleaning area
of the cylinder concaves (4) under each cylinder.
3. The adjustable overhead teeth (5) over the 1st
and 2nd cylinders can be used separately to
increase the pre-conditioning aggressiveness. An
adjustable retention board (6) controls the time
that the vines remain in the fourth cylinder.
4. Optional adjustable concave teeth (7)
are available for the first, second, and
third cylinders for increased harvesting
aggressiveness.
5. Peanuts and vine material fall through the
extraction holes (8) in the fourth cylinder concave
onto the disc separator (9), or travel back into the
separator cylinders (10).
6. The separator cylinders separate the good
peanuts from the coarse vine material and carry
the vine material out of the machine. Peanuts sift
out of the cam-actuated separator cylinders and
are swept down to the disc separator for final
separation.
7. At the disc separator, the good peanuts are
separated from vine material and other light trash.
8. The cleaning fan (11) agitates the material on
the disc separator to aid in separation and blows
light material such as leaves, pops, immature,
diseased peanuts, and other light trash over the
tail board and out of the back of the combine.
9. The higher-density, good peanuts fall through
to the stemmer section (12), while vine material
and sticks advance across the disc separator
and out of the back of the combine.
10. As the good peanuts fall into the stemmer saws,
their stems are removed. Cleaned peanuts fall
into the collection auger (13) and are conveyed
into the elevator air system, which sends them up
to the peanut basket (14).
1
2
3
7
4
6
13
8
14
12
9
10
11
Combine Process (cont.)
Figure 3-1: Combine Process View
5
4/26/19
Operation
M2120A PT Peanut Combine
MAN152
31
Содержание M2120A
Страница 14: ...NOTES Introduction M2120A PT Peanut Combine 11 2 18 MAN152 xii...
Страница 35: ...NOTES 4 24 19 Safety M2120A PT Peanut Combine MAN152 21...
Страница 36: ...This page left blank intentionally Preparation M2120A PT Peanut Combine 4 24 19 MAN152 22...
Страница 42: ...NOTES Saftey M2120A PT Peanut Combine 4 24 19 MAN152 28...
Страница 65: ...NOTES 4 26 19 Operation M2120A PT Peanut Combine MAN152 51...
Страница 66: ...Off Loading Conveyor System M2120A PT Peanut Combine 4 24 19 MAN152 52...
Страница 78: ...NOTES Off Loading Conveyor System M2120A PT Peanut Combine 4 24 19 MAN152 64...
Страница 80: ...This page left blank intentionally Controls and Adjustments M2120A PT Peanut Combine 4 24 19 MAN152 66...
Страница 93: ...NOTES 4 24 19 Controls and Adjustments M2120A PT Peanut Combine MAN152 79...
Страница 94: ...This page left blank intentionally Controls and Adjustments M2120A PT Peanut Combine 4 24 19 MAN152 80...
Страница 103: ...NOTES 4 24 19 Performance M2120A PT Peanut Combine MAN152 89...
Страница 104: ...This page left blank intentionally Performance M2120A PT Peanut Combine 4 24 19 MAN152 90...
Страница 106: ...This page left blank intentionally Maintenance M2120A PT Peanut Combine 4 24 19 MAN152 92...
Страница 115: ...NOTES 4 24 19 Maintenance M2120A PT Peanut Combine MAN152 101...
Страница 116: ...This page left intentionally blank Maintenance M2120A PT Peanut Combine 4 24 19 MAN152 102...
Страница 125: ...NOTES 4 24 19 Peanut Tech M2120A PT Peanut Combine MAN152 111...
Страница 126: ...This page left blank intentionally Peanut Tech M2120A PT Peanut Combine 4 24 19 MAN152 112...
Страница 129: ...NOTES 4 24 19 Appendix A M2120A PT Peanut Combine MAN152 115...