
Hitching Combine to Tractor
1.
Set the tractor drawbar in the center fixed
position with the hitch point centered behind
the end of the PTO shaft.
Figure 3-2: Pin Hitch
2. Position the three-point hitch lower lift links in
the FULLY raised position.
3. Engage the lift lock to prevent the tractor
from inadvertently lowering if the tractor is
equipped with this feature.
5. If the combine is equipped with an optional
ball hitch, install a 2-5/16” hitch ball on the
tractor stationary drawbar. A 1-1/4” hole
size and 2-5/16” high strength hitch ball are
required. Tighten the nut securely.
A hitch ball for a 1-1/8” and 1-1/2” size hole
is also available as well as a number of
bushings to ensure proper fit.
6. Position tractor so the hitch ball will slip
into the tongue-mounted ball socket when
lowered. Lubricate the ball socket with
grease.
7. Using the jack, slowly lower the tongue until
the ball release handle snaps into place.
8. Remove the jack and place in holding bracket
on the side of the tongue, (or the alternative
holding bracket on the side of machine for
storage). Refer to Figure 3-3.
Make sure that the pin hitch pivot moves
freely and is greased adequately.
NOTICE
If the tractor is equipped with a quick hitch,
we highly recommend that you remove it.
Failure to do so can cause damage to
the PTO shaft and driveline.
NOTICE
• 20” for 1-3/8” 21 spline CV shafts
• 20” for 1-3/4” 20 spline CV shafts
Note:
An optional drawbar extension
(AMADAS part #61359) will be necessary to
reach the proper hitch point dimension on
most tractors with 1-3/8” 21 spline PTO output
shafts.
PTO Between 5” and
16” above drawbar
20”
16”
5”
Figure 3-3: Jack Stow Locations
Jack Engaged
on Tongue
Alternative Jack
Stow Holding
Bracket
4. If combine is equipped with a pin hitch, lower/
raise jack until the pin hitch will be between
the draw bar and the upper pin plate. Once in
position, install the pin and pin keeper.
Note:
An optional bushing is available to
match the pin diameter of various tractors.
DO NOT
attempt to support the machine
with the jack in the alternate position. This
position is for storage ony.
NOTICE
Operation
M2120A PT Peanut Combine
4/26/19
MAN152
32
Содержание M2120A
Страница 14: ...NOTES Introduction M2120A PT Peanut Combine 11 2 18 MAN152 xii...
Страница 35: ...NOTES 4 24 19 Safety M2120A PT Peanut Combine MAN152 21...
Страница 36: ...This page left blank intentionally Preparation M2120A PT Peanut Combine 4 24 19 MAN152 22...
Страница 42: ...NOTES Saftey M2120A PT Peanut Combine 4 24 19 MAN152 28...
Страница 65: ...NOTES 4 26 19 Operation M2120A PT Peanut Combine MAN152 51...
Страница 66: ...Off Loading Conveyor System M2120A PT Peanut Combine 4 24 19 MAN152 52...
Страница 78: ...NOTES Off Loading Conveyor System M2120A PT Peanut Combine 4 24 19 MAN152 64...
Страница 80: ...This page left blank intentionally Controls and Adjustments M2120A PT Peanut Combine 4 24 19 MAN152 66...
Страница 93: ...NOTES 4 24 19 Controls and Adjustments M2120A PT Peanut Combine MAN152 79...
Страница 94: ...This page left blank intentionally Controls and Adjustments M2120A PT Peanut Combine 4 24 19 MAN152 80...
Страница 103: ...NOTES 4 24 19 Performance M2120A PT Peanut Combine MAN152 89...
Страница 104: ...This page left blank intentionally Performance M2120A PT Peanut Combine 4 24 19 MAN152 90...
Страница 106: ...This page left blank intentionally Maintenance M2120A PT Peanut Combine 4 24 19 MAN152 92...
Страница 115: ...NOTES 4 24 19 Maintenance M2120A PT Peanut Combine MAN152 101...
Страница 116: ...This page left intentionally blank Maintenance M2120A PT Peanut Combine 4 24 19 MAN152 102...
Страница 125: ...NOTES 4 24 19 Peanut Tech M2120A PT Peanut Combine MAN152 111...
Страница 126: ...This page left blank intentionally Peanut Tech M2120A PT Peanut Combine 4 24 19 MAN152 112...
Страница 129: ...NOTES 4 24 19 Appendix A M2120A PT Peanut Combine MAN152 115...