
Operating Procedure (cont.)
8. Set the elevator air control handle in one-half
open position if using manual control.
Elevator Air
Control
Figure 3-27: Elevator Air Control
Note:
790 PTO RPM is standard for most
machines. Some combines are equipped
with an optional drive that requires different
input speeds. Refer to the PTO RPM on your
machine.
Note:
Make sure the basket lip extension is in
the operating position. Leaving the lip folded
obstructs the discharge of air from the bin.
Figure 3-28: Basket Lip Open
1. Move forward and harvest for 50 yards.
ALWAYS stop the combine, set the
parking brake, shut the tractor motor off,
and remove the key before you leave the
tractor for any reason.
2. Stop and check for proper operation. Refer to
the “Proper Operation” table at the end of this
section.
3. Make any necessary adjustments.
4. Run the combine down the windrow
approximately another 50 yards and check
performance again.
5. Set the controls as desired and continue to the
end of the row.
Begin Operations:
It is important to perform checks for
proper operation
.
To skip this step puts you at risk for personal
injury and the combine at risk for machine
damage.
CAUTION
!
9. Set the header height so that the pickup spring
fingers are one to two inches above the soil
(with the combine wheels in the row centers
as it moves over the windrow).
10. Engage the PTO and set combine speed at
100% (790 RPM tractor PTO output). Refer
to “PTO Speed Adjustment” in Chapter
5. Controls and Adjustments for more
information.
11. Harvest conditions vary. Operate the tractor
accordingly at 1 to 2-1/2 miles per hour.
!
DANGER
Operation
M2120A PT Peanut Combine
4/26/19
MAN152
44
Содержание M2120A
Страница 14: ...NOTES Introduction M2120A PT Peanut Combine 11 2 18 MAN152 xii...
Страница 35: ...NOTES 4 24 19 Safety M2120A PT Peanut Combine MAN152 21...
Страница 36: ...This page left blank intentionally Preparation M2120A PT Peanut Combine 4 24 19 MAN152 22...
Страница 42: ...NOTES Saftey M2120A PT Peanut Combine 4 24 19 MAN152 28...
Страница 65: ...NOTES 4 26 19 Operation M2120A PT Peanut Combine MAN152 51...
Страница 66: ...Off Loading Conveyor System M2120A PT Peanut Combine 4 24 19 MAN152 52...
Страница 78: ...NOTES Off Loading Conveyor System M2120A PT Peanut Combine 4 24 19 MAN152 64...
Страница 80: ...This page left blank intentionally Controls and Adjustments M2120A PT Peanut Combine 4 24 19 MAN152 66...
Страница 93: ...NOTES 4 24 19 Controls and Adjustments M2120A PT Peanut Combine MAN152 79...
Страница 94: ...This page left blank intentionally Controls and Adjustments M2120A PT Peanut Combine 4 24 19 MAN152 80...
Страница 103: ...NOTES 4 24 19 Performance M2120A PT Peanut Combine MAN152 89...
Страница 104: ...This page left blank intentionally Performance M2120A PT Peanut Combine 4 24 19 MAN152 90...
Страница 106: ...This page left blank intentionally Maintenance M2120A PT Peanut Combine 4 24 19 MAN152 92...
Страница 115: ...NOTES 4 24 19 Maintenance M2120A PT Peanut Combine MAN152 101...
Страница 116: ...This page left intentionally blank Maintenance M2120A PT Peanut Combine 4 24 19 MAN152 102...
Страница 125: ...NOTES 4 24 19 Peanut Tech M2120A PT Peanut Combine MAN152 111...
Страница 126: ...This page left blank intentionally Peanut Tech M2120A PT Peanut Combine 4 24 19 MAN152 112...
Страница 129: ...NOTES 4 24 19 Appendix A M2120A PT Peanut Combine MAN152 115...