
PTO Between 5” and
16” above drawbar
20”
16”
5”
Pre-Delivery Checks (cont.)
Death or serious injury can result from
entanglement if shields and guards are
not in place.
Replace all shields before starting combine
operation.
Driveline shields and guards must be in
place anytime the combine is in operation.
21. Replace or close all shields.
22. Install the PTO driveline and grease.
Make sure to set the tractor hitch pin at
the specified length from the PTO output
shaft. Refer to Figure 2-7.
Figure 2-7: PTO Driveline
Prepare the combine for operation.
1. Start the tractor.
2. Engage the PTO.
3. Increase slowly to operating speed (100%)
or 790 RPM.
Stop the combine and do final pre-checks.
1. Check the tightness of all bolts, nuts, chains,
belts, and sprockets.
2. Check all pulleys and belts for heat indicating
looseness.
3. Check belt and chain alignments.
4. Check for overheated gearboxes and hot bearings.
5. Check machine to make sure all safety decals
are in place.
TO PREVENT MACHINE DAMAGE MAINTAIN
PROPER TIRE INFLATION.
800 / 65 R32 – Radial: 44 PSI
400 FT-LB LUG NUT torque (flanged)
NOTICE
6. Torque all lug nuts to proper specifications
(400 ft/lb). See the Torque Specifications
table on the Specification page in the
Introduction
Section or at the end of Chapter
7.
Maintenance
.
7. Check tire pressure and inflate tires to
recommended pressure:
800/65 R32 – Radial: 44 PSI
!
DANGER
Note:
Refer to the PTO RPM on your
machine. 790 PTO RPM is standard for most
machines. Some combines are equipped with
optional drives that require different
input speeds.
IMPORTANT!
Operate combine for 20 minutes
prior to your first field operation.
4/24/19
Preparation
M2120A PT Peanut Combine
MAN152
27
Содержание M2120A
Страница 14: ...NOTES Introduction M2120A PT Peanut Combine 11 2 18 MAN152 xii...
Страница 35: ...NOTES 4 24 19 Safety M2120A PT Peanut Combine MAN152 21...
Страница 36: ...This page left blank intentionally Preparation M2120A PT Peanut Combine 4 24 19 MAN152 22...
Страница 42: ...NOTES Saftey M2120A PT Peanut Combine 4 24 19 MAN152 28...
Страница 65: ...NOTES 4 26 19 Operation M2120A PT Peanut Combine MAN152 51...
Страница 66: ...Off Loading Conveyor System M2120A PT Peanut Combine 4 24 19 MAN152 52...
Страница 78: ...NOTES Off Loading Conveyor System M2120A PT Peanut Combine 4 24 19 MAN152 64...
Страница 80: ...This page left blank intentionally Controls and Adjustments M2120A PT Peanut Combine 4 24 19 MAN152 66...
Страница 93: ...NOTES 4 24 19 Controls and Adjustments M2120A PT Peanut Combine MAN152 79...
Страница 94: ...This page left blank intentionally Controls and Adjustments M2120A PT Peanut Combine 4 24 19 MAN152 80...
Страница 103: ...NOTES 4 24 19 Performance M2120A PT Peanut Combine MAN152 89...
Страница 104: ...This page left blank intentionally Performance M2120A PT Peanut Combine 4 24 19 MAN152 90...
Страница 106: ...This page left blank intentionally Maintenance M2120A PT Peanut Combine 4 24 19 MAN152 92...
Страница 115: ...NOTES 4 24 19 Maintenance M2120A PT Peanut Combine MAN152 101...
Страница 116: ...This page left intentionally blank Maintenance M2120A PT Peanut Combine 4 24 19 MAN152 102...
Страница 125: ...NOTES 4 24 19 Peanut Tech M2120A PT Peanut Combine MAN152 111...
Страница 126: ...This page left blank intentionally Peanut Tech M2120A PT Peanut Combine 4 24 19 MAN152 112...
Страница 129: ...NOTES 4 24 19 Appendix A M2120A PT Peanut Combine MAN152 115...