Figure 32: Minimum PTO Driveline Length
Attaching and Checking Driveline
(cont.)
7. Be certain that the driveline length does not exceed 58
inches when fully extended. Refer to Figure 3-8.
58”
Extended
Figure 3-8: Maximum PTO Driveline Length
9. Refer to Chapter 1.
Safety
for safety measures
before operation.
10.Turn the tractor slowly. At the tightest possible
turn radius observe that the driveline is at the
shortest length and fully collapsed.
Figure 3-9: Turn Radius
11. Turn the tractor off and remove the key.
32”
Compressed
13. Repeat steps 8-12 in opposite direction.
Figure 3-10: Minimum PTO Driveline Length
In most cases, the tractor will turn until the
tire is very close to the combine tongue
without the telescoping shaft bottoming out.
If this is not possible with your tractor, do
not exceed the observed limits or severe
damage to the combine and tractor will occur,
whether the PTO is engaged or disengaged.
NOTICE
Do NOT allow the tractor tire to touch the
tongue, or the universal driveline to reach its
closed (bottomed out) position during operation.
Do NOT allow the constant velocity (CV) joint
to exceed 80 degrees. Severe damage to the
driveline, tractor, or combine will occur.
NOTICE
ALWAYS stop the combine, set the
parking brake, shut the tractor motor off,
and remove the key before you leave the
tractor for any reason.
Failure to check driveline length and
clearance can cause damage to combine
and tractor.
NOTICE
12. Measure the driveline length. Refer to Figure 3-10.
Note:
If the driveline Length is more than 72
inches, check the drawbar setting and move
the drawbar out.
8. Start the tractor engine and raise the pickup
header to its highest position.
!
DANGER
4/26/19
Operation
M2120A PT Peanut Combine
MAN152
35
Содержание M2120A
Страница 14: ...NOTES Introduction M2120A PT Peanut Combine 11 2 18 MAN152 xii...
Страница 35: ...NOTES 4 24 19 Safety M2120A PT Peanut Combine MAN152 21...
Страница 36: ...This page left blank intentionally Preparation M2120A PT Peanut Combine 4 24 19 MAN152 22...
Страница 42: ...NOTES Saftey M2120A PT Peanut Combine 4 24 19 MAN152 28...
Страница 65: ...NOTES 4 26 19 Operation M2120A PT Peanut Combine MAN152 51...
Страница 66: ...Off Loading Conveyor System M2120A PT Peanut Combine 4 24 19 MAN152 52...
Страница 78: ...NOTES Off Loading Conveyor System M2120A PT Peanut Combine 4 24 19 MAN152 64...
Страница 80: ...This page left blank intentionally Controls and Adjustments M2120A PT Peanut Combine 4 24 19 MAN152 66...
Страница 93: ...NOTES 4 24 19 Controls and Adjustments M2120A PT Peanut Combine MAN152 79...
Страница 94: ...This page left blank intentionally Controls and Adjustments M2120A PT Peanut Combine 4 24 19 MAN152 80...
Страница 103: ...NOTES 4 24 19 Performance M2120A PT Peanut Combine MAN152 89...
Страница 104: ...This page left blank intentionally Performance M2120A PT Peanut Combine 4 24 19 MAN152 90...
Страница 106: ...This page left blank intentionally Maintenance M2120A PT Peanut Combine 4 24 19 MAN152 92...
Страница 115: ...NOTES 4 24 19 Maintenance M2120A PT Peanut Combine MAN152 101...
Страница 116: ...This page left intentionally blank Maintenance M2120A PT Peanut Combine 4 24 19 MAN152 102...
Страница 125: ...NOTES 4 24 19 Peanut Tech M2120A PT Peanut Combine MAN152 111...
Страница 126: ...This page left blank intentionally Peanut Tech M2120A PT Peanut Combine 4 24 19 MAN152 112...
Страница 129: ...NOTES 4 24 19 Appendix A M2120A PT Peanut Combine MAN152 115...