Sensor Installation and Connection
3-67
Connecting the Sensors and Sampler
to the Monitor
After installing the ring and sensors and securing the sensor cables
to the pipe and manhole wall, connect the sensor cables to the
appropriate ports on the top of the monitor. The ports that receive
the sensors are labeled
Channel 1
and
Channel 2
.
The
supports the connection of two sensors in any
combination, including two of the same sensor type, to the channel
ports. However, to simplify the installation and configuration
process, ADS recommends developing a system or convention to
ensure consistency when attaching the sensors to the channel ports
and assigning the corresponding channels to the sensor devices in
Q
start
.
Establish a priority or order in which particular sensors are assigned
to a specific channel and, when applicable and possible, correspond
the channel number to the monitoring point. For example, consider
always assigning the Peak Combo Sensor to Channel 1 and the
second sensor to Channel 2.
The
also enables you to connect a water quality sampler
to the monitor for flow proportional or level-based sampling
operations. ADS offers two 25-foot (7.6-m) cable options for
connecting the sampler to the monitor based on the type of
sampling.
Flow Proportional (ADS p/n 8000-0348-01)
Level Actuation (ADS p/n 8000-0348-02)
Connect the sensor and sampler (when applicable) cables to the
monitor ports in the following way:
1.
Place the monitor in an upright position to view the monitor
connector ports.
Содержание Intrinsically-Safe TRITON+
Страница 19: ...1 12 ADS TRITON Manual Control Drawing ...
Страница 25: ...1 18 ADS TRITON Manual First page of the TRITON ATEX Certificate ...
Страница 27: ...1 20 ADS TRITON Manual First page of the TRITON IECEx Certificate of Conformity ...
Страница 29: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 1 ...
Страница 30: ...Introduction 1 23 CSA Certificate of Compliance Page 2 ...
Страница 32: ...Introduction 1 25 Sample TRITON Declaration of Conformity Page 2 ...
Страница 34: ...Introduction 1 27 Activate Monitor Qstart software Run Diagnostics and Perform Confirmations Qstart software ...
Страница 49: ...2 12 ADS TRITON Manual ExPAC XBUS ...
Страница 159: ...External Power 5 9 Power supply firmly secured to the DIN rail Front view of power supply mounted to DIN rail ...
Страница 171: ...External Power 5 21 POWER SUPPLY DC OUTPUT TERMINAL CONNECTIONS Wires exiting DC output terminal on power supply ...
Страница 231: ...6 44 ADS TRITON Manual Editing the Smart Ultrasonic Depth Sensor Device Edit Smart Depth 1 Parameters dialog ...