
7-1
C H A P T E R 7
Monitor Installation
After installing the sensors and establishing communications, install
the ADS
®
™
monitor in the manhole. The monitor
mounts inside the manhole by an aluminum mounting bracket
attached to the monitor and bolted to the manhole wall or rim
or
by
a hook connected to the monitor that attaches to a rung. The
following procedures for monitor installation apply to most sites.
However, because manholes differ in many ways, some sites may
require the installer to implement slight modifications to the
standard installation technique.
Note:
When ordering a monitor, please also indicate the
mounting option to ensure you receive the appropriate
installation hardware:
wall/rim
mount (ADS p/n I40-0009)
or
rung
mount (ADS p/n 8000-0021).
Before installing the monitor at the site, activate the monitor to
verify that the monitor is configured correctly for the application
and that the battery pack is operating at an adequate voltage. Make
any necessary changes to the configuration
before
mounting the
unit. Refer to
Chapter 10
,
Maintenance and Troubleshooting
, for
information on replacing the battery pack, when necessary.
Note:
Manhole and sewer system work involves confined
space entry and is inherently dangerous. Therefore,
installers and technicians must comply with all federal,
state, and municipal regulations concerning confined space
entry. ADS is not responsible for any injuries, damages,
Содержание Intrinsically-Safe TRITON+
Страница 19: ...1 12 ADS TRITON Manual Control Drawing ...
Страница 25: ...1 18 ADS TRITON Manual First page of the TRITON ATEX Certificate ...
Страница 27: ...1 20 ADS TRITON Manual First page of the TRITON IECEx Certificate of Conformity ...
Страница 29: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 1 ...
Страница 30: ...Introduction 1 23 CSA Certificate of Compliance Page 2 ...
Страница 32: ...Introduction 1 25 Sample TRITON Declaration of Conformity Page 2 ...
Страница 34: ...Introduction 1 27 Activate Monitor Qstart software Run Diagnostics and Perform Confirmations Qstart software ...
Страница 49: ...2 12 ADS TRITON Manual ExPAC XBUS ...
Страница 159: ...External Power 5 9 Power supply firmly secured to the DIN rail Front view of power supply mounted to DIN rail ...
Страница 171: ...External Power 5 21 POWER SUPPLY DC OUTPUT TERMINAL CONNECTIONS Wires exiting DC output terminal on power supply ...
Страница 231: ...6 44 ADS TRITON Manual Editing the Smart Ultrasonic Depth Sensor Device Edit Smart Depth 1 Parameters dialog ...