
6-82 ADS Manual
Collecting Data from the Monitor
Note:
monitors using SIMs with dynamic IP
addresses are capable of direct-serial or one-way, wireless
communication. Enable data collects for these monitors by
configuring and using the FTP Operations device. For
more information see
Editing the FTP Operations Device
,
page 6-61.
Collect data from a monitor in the following way:
1.
Select the monitor from which you want to collect data from
the
Location Name
drop-down list in the
Monitor
section on
the
ADS Qstart
dialog.
2.
Click on the
Collect
button in the
Functions
section.
The Collect Span dialog displays for designating the date/time
range for which you want to collect the data.
3.
Designate the date and time from which you want to begin
collecting data from the monitor in the
Start
field.
Qstart
defaults to a start date and time of one second past the last data
point stored in the local directory or network for the current
location. To edit a particular value in the
Start
date or time
field, select the value and enter a new value
or
use the up/down
arrows to advance through the numbers until you reach the
desired value.
4.
Designate the date and time up to which you want to collect
data from the monitor in the
End
field. The end date and time
in
Qstart
default to the date and time on the local computer.
To edit a particular value in the corresponding date or time,
select the value and enter a new value
or
use the up/down
arrows to advance through the numbers until you reach the
desired value.
5.
Click on the
OK
button.
Содержание Intrinsically-Safe TRITON+
Страница 19: ...1 12 ADS TRITON Manual Control Drawing ...
Страница 25: ...1 18 ADS TRITON Manual First page of the TRITON ATEX Certificate ...
Страница 27: ...1 20 ADS TRITON Manual First page of the TRITON IECEx Certificate of Conformity ...
Страница 29: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 1 ...
Страница 30: ...Introduction 1 23 CSA Certificate of Compliance Page 2 ...
Страница 32: ...Introduction 1 25 Sample TRITON Declaration of Conformity Page 2 ...
Страница 34: ...Introduction 1 27 Activate Monitor Qstart software Run Diagnostics and Perform Confirmations Qstart software ...
Страница 49: ...2 12 ADS TRITON Manual ExPAC XBUS ...
Страница 159: ...External Power 5 9 Power supply firmly secured to the DIN rail Front view of power supply mounted to DIN rail ...
Страница 171: ...External Power 5 21 POWER SUPPLY DC OUTPUT TERMINAL CONNECTIONS Wires exiting DC output terminal on power supply ...
Страница 231: ...6 44 ADS TRITON Manual Editing the Smart Ultrasonic Depth Sensor Device Edit Smart Depth 1 Parameters dialog ...