
3-36 ADS
Manual
Tap the sensor mounting plate to the right or left with a
rubber mallet until it is level.
Warning:
Tapping the mounting plate with the sensor
attached could damage the sensor. Always remove the
sensor before tapping the plate with a mallet.
Reattach the sensor to the mounting plate, and recheck the
level.
7.
Fully tighten the ring until it fits securely and completely flush
against the pipe wall.
Warning:
Avoid over-tightening the ring. This could
bend the crank assembly.
8.
Install an anchor bolt in the manhole wall just above the pipe
crown. Using an anchor cable tie, secure the Surface Combo
Sensor cable.
9.
Restore any silt moved to its previous level, and confirm that
the Peak Combo Sensor is still above the silt level.
10.
Measure the physical offsets for the sensors in the following
way.
Peak Combo Sensor Physical Offset
Manually
measure the depth of the flow from the bottom of the pipe
to the flow surface, and then measure the distance from the
nose
(i.e., front end) of the Peak Combo Sensor to the flow
surface. Subtract the second measurement from the initial
depth of flow to determine the physical offset.
Содержание Intrinsically-Safe TRITON+
Страница 19: ...1 12 ADS TRITON Manual Control Drawing ...
Страница 25: ...1 18 ADS TRITON Manual First page of the TRITON ATEX Certificate ...
Страница 27: ...1 20 ADS TRITON Manual First page of the TRITON IECEx Certificate of Conformity ...
Страница 29: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 1 ...
Страница 30: ...Introduction 1 23 CSA Certificate of Compliance Page 2 ...
Страница 32: ...Introduction 1 25 Sample TRITON Declaration of Conformity Page 2 ...
Страница 34: ...Introduction 1 27 Activate Monitor Qstart software Run Diagnostics and Perform Confirmations Qstart software ...
Страница 49: ...2 12 ADS TRITON Manual ExPAC XBUS ...
Страница 159: ...External Power 5 9 Power supply firmly secured to the DIN rail Front view of power supply mounted to DIN rail ...
Страница 171: ...External Power 5 21 POWER SUPPLY DC OUTPUT TERMINAL CONNECTIONS Wires exiting DC output terminal on power supply ...
Страница 231: ...6 44 ADS TRITON Manual Editing the Smart Ultrasonic Depth Sensor Device Edit Smart Depth 1 Parameters dialog ...