select
tResResponse
timer
reservation granted RES_GRT
t1>tResResponse, then 1-
of-n-control in 'cause' is
set
t1
reservation request RES_RQ
IEC05000093-2-en.vsd
IEC05000093 V2 EN
Figure 337:
tResResponse
The timer
tExecutionFB
supervises the time between the execute command and the
command termination, see Figure
execute command
position L1
t1>tExecutionFB, then
long-operation-time in
'cause' is set
open
close
close
open
position L3
close
open
position L2
t1
tExecutionFB timer
cmd termination L1
cmd termination L2
cmd termination L3
cmd termination
position
open
close
* The cmd termination will be delayed one execution sample .
*
APCtExecutionFB=IEC0
5000094=2=en=Original
.vsd
IEC05000094 V2 EN
Figure 338:
tExecutionFB
The parameter
tSynchrocheck
is used to define the maximum allowed time between
the execute command and the input SYNC_OK to become true. If SYNC_OK=true at
the time the execute command signal is received, the timer "tSynchrocheck" will not
start. The start signal for the synchronizing is obtained if the synchrocheck conditions
are not fulfilled.
Section 14
1MRK502052-UEN B
Control
722
Technical manual
Содержание Relion REG670
Страница 1: ...Relion 670 series Generator protection REG670 2 0 IEC Technical manual ...
Страница 2: ......
Страница 44: ...38 ...
Страница 58: ...52 ...
Страница 80: ...74 ...
Страница 106: ...100 ...
Страница 482: ...476 ...
Страница 548: ...542 ...
Страница 570: ...564 ...
Страница 600: ...594 ...
Страница 608: ...602 ...
Страница 630: ...624 ...
Страница 862: ...856 ...
Страница 1094: ...1088 ...
Страница 1226: ...1220 ...
Страница 1250: ...1244 ...
Страница 1297: ...1291 ...