3 - 20
INSP
ADJ
VALVE CLEARANCE ADJUSTMENT
5. Adjust:
• Valve clearance
Adjustment steps:
• Loosen the timing chain tensioner cap
bolt.
• Remove the timing chain tensioner and
camshaft caps.
NOTE:
Remove the camshaft cap bolts in a criss-
cross pattern from the outside working
inwards.
• Remove the camshaft (exhaust
1
and
intake
2
).
NOTE:
Attach a wire
3
to the timing chain to pre-
vent it from falling into the crankcase.
• Remove the valve lifters
4
and the pads
5
.
NOTE:
• Place a rag in the timing chain space to
prevent pads from falling into the crank-
case.
• Identity each valve lifter and pad position
very carefully so that they can be rein-
stalled in their original place.
• Select the proper pad using the pad
selecting table.
Pad range
Pad Availability:
25 increments
No. 120
~
No. 240
1.20 mm
~
2.40 mm
Pads are available
in 0.05 mm incre-
ments
NOTE:
The thickness
a
of each pad is indicated in
hundreths of millimeters on the pad upper
surface.
1
2
3
Summary of Contents for YZ450F
Page 47: ...GEN INFO MEMO ...
Page 67: ...GEN INFO MEMO ...
Page 193: ...INSP ADJ MEMO ...
Page 593: ... ELEC MEMO ...
Page 623: ...TUN MEMO ...
Page 648: ......
Page 649: ......