
4-68
POWR
TR
FRONT AXLE AND TRACK
INSPECTION
1. Inspect:
• Track
1
• Slide metal
2
Wear/cracks/damage
→
Replace.
1
2
2. Inspect:
• Sprocket wheels
1
Wear/break/damage
→
Replace.
• Front axle
2
Bends/scratches (excessive)/damage
→
Replace.
È
FX10/FX10RT/FX10RTR/FX10RTRA
É
FX10MT/FX10MTR/FX10MTRA
3. Inspect:
• Bearing
Pitting/damage
→
Replace.
1
2
È
1
2
É
INSTALLATION
1. Install:
• Oil seal
1
NOTE:
Press the oil seal onto the bearing housing as
shown.
È
2.5 ~ 3.5 mm (0.10 ~ 0.14 in)
1
È
Summary of Contents for FX Nytro FX10MTRAX
Page 2: ......
Page 8: ......
Page 63: ...INSP ADJ ...
Page 577: ...FI ...
Page 633: ...FI ...
Page 695: ... ELEC ...
Page 709: ... ELEC ...
Page 747: ... ELEC ...
Page 755: ... ELEC ...
Page 852: ...9 43 SPEC CABLE ROUTING 9 1 2 3 4 5 6 6 7 7 8 ...
Page 854: ......
Page 855: ......