
4-9
POWR
TR
6. Install:
• Primary sheave spring
1
• Primary sheave cap
2
NOTE:
Be sure the sheave cap match mark (X) is aligned
with the spider match mark (X).
T
R
.
.
Primary sheave cap bolt:
14 Nm (1.4 m · kg, 10 ft · lb)
INSTALLATION
1. Install:
• Primary sheave assembly
CAUTION:
Be sure to remove any oil or grease from the
tapered portion of the crankshaft and spider
using a cloth dampened with thinner.
2. Apply:
• Engine oil (to threads of primary sheave bolt)
3. Tighten:
• Primary sheave bolt
1
Tightening steps:
• Hold the primary sheave
2
using the sheave
holder
3
and tighten the primary sheave bolt to
specification.
Sheave holder:
90890-01701
Primary clutch holder:
YS-01880-A
T
R
.
.
Primary sheave bolt:
1st:
120 Nm (12.0 m · kg, 85 ft · lb)
2
3
1
PRIMARY SHEAVE AND DRIVE V-BELT
Summary of Contents for FX Nytro FX10MTRAX
Page 2: ......
Page 8: ......
Page 63: ...INSP ADJ ...
Page 577: ...FI ...
Page 633: ...FI ...
Page 695: ... ELEC ...
Page 709: ... ELEC ...
Page 747: ... ELEC ...
Page 755: ... ELEC ...
Page 852: ...9 43 SPEC CABLE ROUTING 9 1 2 3 4 5 6 6 7 7 8 ...
Page 854: ......
Page 855: ......