– Apply thin bead of sealant -arrows- from below into both cor‐
ners between cylinder head gasket and cylinder block, so that
holes in cylinder head gasket are filled.
– Check if dowel sleeves for cover are inserted in the cylinder
block.
– Apply sealant - D 176 501 A1- as shown and fit the cover.
Note
Install the timing chain cover within 5 minutes after sealant has
been applied.
– Tighten bolts in 3 stages as follows:
A - Pre-tighten bolts -1- to 5 Nm.
B - Tighten bolts -2- to 23 Nm.
C - Tighten bolts -1- to 10 Nm.
– Install crankshaft oil seal
– Install flywheel
– Install gearbox ⇒ Rep. gr. 34 ; Removing and installing gear‐
box .
2.3
Removing and installing the camshaft
control valve seal
Special tools and workshop equipment required
CC 2012 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤
6-cylinder direct-injection engine (3.6 l engine, 4V) - Edition 06.2019
78
Rep. gr.15 - Cylinder head, valve gear