Removing:
Note
♦
Note safety precautions before starting installation work
♦
Observe rules for cleanliness
.
♦
If the fuel rail is removed, the injector O-ring, support washer,
spring element and combustion chamber seal must always be
renewed
.
♦
With the injectors for cylinders 1, 3 and 5, also renew the seal
.
Caution
Observe the following during all assembly work, particularly in
the engine compartment due to the restricted space:
♦ Route lines of any kind and cables so that original routing
is restored.
♦ Ensure that there is sufficient clearance to all moving or
hot components.
– Unclip cover rail for ignition cable harness -arrows- and re‐
move forwards from retaining lugs -A-.
– Position assembly tool - T10118- on locking button -arrow- and
carefully pull off all connectors of ignition coils with output
stage .
CC 2012 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤
6-cylinder direct-injection engine (3.6 l engine, 4V) - Edition 06.2019
182
Rep. gr.24 - Mixture preparation - injection