E5 Series High Performance Universal Inverter User’s Manual
Chapter 2 Mechanical Installation
11
Chapter 2 Mechanical Installation
T.T Environment for Product Installation
Do not install the inverter in the sites with oil mist, metal powder and dust.
Do not install the inverter in the sites with hazardous gas and liquid, and corrosive, combustible and
explosive gas.
Do not install the inverter in salty sites.
Do not install the inverter in the sites with direct sunlight.
Do not mount the inverter on the combustible materials, such as wood.
Keep the drilling scraps away from the inverter during the installation.
Mount the inverter vertically in the electric control cabinet, mount the cooling fan or air conditioner
to prevent the ambient temperature from rising to above 45 ºC.
For the sites with adverse environment, it is recommended to mount the inverter heat
-
sink outside
the cabinet.
T.T Mounting Direction and Space
For excellent cooling effect, the inverter must be mounted vertically, and certain clearance must be
maintained, as shown in the following figure.
FigureT−T Mounting direction and space for E5−H−4T7.5G and below power class
Note:
When the E5−H−4T7.5G and below power class inverters are mounted side by side in the cabinet,
please remove the upper dust guard and the lower leading board.
Air circulation position
Air circulation position
Above 120mm
Above 120mm
Air circulation position
Air circulation position
Above 120mm
Above 120mm
Above 30mm
Above 30mm
Above 30mm
Above 30mm
Summary of Contents for E5 Series
Page 1: ...E5 Series High Performance Universal Inverter USER S MANUAL E5 Series USER S MANUAL ...
Page 7: ...vi T Setting Process for Open Loop ...
Page 8: ...vii Open loop setting process continued ...
Page 9: ...viii 3 Setting Process for Closed Loop ...
Page 10: ...ix Setting Process for Closed Loop continued ...