background image

Installation and Operation Manual

   

IDRA DS 200-300-430-550

IDRA DS 750-1000

Solar  |  solar storage cylinder

IDRA DS

Installation and Operation Manual

EN

   

Summary of Contents for IDRA DS 200

Page 1: ...Installation and Operation Manual IDRA DS 200 300 430 550 IDRA DS 750 1000 Solar solar storage cylinder IDRA DS Installation and Operation Manual EN ...

Page 2: ... is not going to be used for an extended period of time contact the manufacturer s Technical As sistance Centre to have at least the following operations performed Close the shut off cocks for the domestic hot water circuit Shut down the boiler connected to the storage cylinder as instructed in its own manual Switch the storage cylinder OFF at the control panel if fitted and at the mains power swi...

Page 3: ...ation made of expanded polyurethane free from CFC chlorofluorocarbons a flange is provided for easy cleaning and maintenance of the anti corrosion magnesium anode 4 IDENTIFICATION The B IDRA DS solar heaters can be identified by Data plate This lists the technical specifications and performance of the product BALLON SOLAIRE Modele Model Fabrication Code Année bar W l W kW l 1 BOLLITORE SOLARE Mode...

Page 4: ...1 38 1 53 1 33 1 51 2 09 2 24 W K Energy class B B B B B B PERFORMANCE RELATING TO INTEGRATION COIL Upper coil continuous efficiency ACS 10 45 C Vbu reference volume Coil delivery temperature 80 C T 20 C 16 1 23 31 4 31 4 50 50 kW 400 572 774 774 1240 1240 l h 70 C T 20 C 10 3 17 20 7 20 7 38 38 kW 247 425 505 505 930 930 l h 60 C T 20 C 6 5 11 15 5 15 5 25 25 kW 160 277 375 375 620 620 l h 50 C T...

Page 5: ... heater pre heated to the indicated temperature considering an in crease of the domestic water temperature of 30 C between inlet and outlet according to EN 12897 Temperature of accumulation tank lower part 70 C 374 438 659 863 1190 1530 l 60 C 284 375 531 675 877 1110 l 50 C 205 310 390 485 762 790 l Integration coil probe point reference Vbu reference volume Solar coil probe reference Pressure dr...

Page 6: ...h open Apply the upper insulation 2 and the upper cover 5 use a spatula if the cover application on the protection plate proves difficult Close the interlocking flaps L completely which were previously left with an open tooth If disassembling is required proceed in reverse order 4 5 2 1 3 3 1 1 3 L 3 L b Wear suitable personal protective equipment and use suitable safety devices 9 PLACE OF INSTALL...

Page 7: ... 40 600 1 40 600 mm DF Flange internal diameter 130 130 130 130 130 130 mm A 171 171 208 207 75 75 mm B 243 253 329 348 289 289 mm C 403 393 427 443 428 421 mm D 598 693 684 788 799 834 mm E 738 903 824 1088 969 1006 mm F 878 1113 964 1328 1144 1337 mm G 953 1233 1064 1428 1234 1426 mm H 1029 1323 1174 1538 1321 1506 mm I 1098 1438 1289 1653 1444 1637 mm L 1170 1670 1440 1784 1707 2032 mm M 1338 1...

Page 8: ...ly cocks in the domestic water circuit are all open Switch the electricity supply ON at the mains power switch and at control panel switch if fitted 15 TEMPORARY SHUTDOWN To reduce to the environmental impact and save energy in case of brief absences week ends short trips etc and with exter nal temperatures above 0 C set the heater temperature control where available to the minimum value b If the ...

Reviews: