
Index
Index-2
Turin Networks
Release TR3.2.1
Timing
Central office
Checklist
cabling
alarm, 12-27
network, 12-25
timing, Ethernet, RS-232, 12-30
initial configuration, 12-35
installation
power system hardware, 12-22
system hardware, 12-23
power
CLI
commands
conventions, 11-3
initial configuration, 11-8, 12-36
Commissioning
node, 11-1
node-id, 11-3
node-ip, 11-3
oper-mode, 11-4
process, 11-6
standard, 11-4
Configuration
Connections
alarm
audible output, 9-10
audible relay output, 9-12
fuse, PDAP, 9-22
fuse, PDAP-4S, 9-18
PDAP visual relay input, 9-23
PDAP-4S visual relay input, 9-19
power, 9-17, 9-21
visual output, 9-6, 9-8
Contact
return materials
Technical Assistance
D
DCN
DS1
cabling options, 2-24, 2-26, 2-28
ECM Telco 64 connector pinouts, 2-31
panel cabling, 8-23
DS1/E1
ECM
2-slot 28/21-port Telco 64 ECM, 2-16
Telco 64 connector pinouts, 2-32
electrical connector
module, 2-24, 8-15
placement, 2-24
DS1
⁄
E1
DS3
cabling, 8-24, 8-30
cabling schemes
16-slot shelf, 2-38
20-slot shelf, 2-36
6-slot shelf, 2-39
DS3 mapped
electrical connector module
DS3/E3
ECM
2-slot, 12-port BNC ECM, 2-16
3-slot, 24-port BNC ECM, 2-16
3-slot, 48-port Mini-SMB ECM, 2-16
electrical connector module
DS3/E3/EC-1
12-port, 12-2
24-port, 12-2
card placement, 12-2
DS3/EC-1
E
E1
cabling options, 2-24, 2-26, 2-28
ECM
2-slot, 42-port Mini-SMB ECM, 2-16
electrical connector module, 8-15
Telco 64 connector pinouts, 2-31
Timing
E1/DS1
ECM Telco 64 connector pinouts
E3
cabling, 8-24, 8-30
cabling schemes
16-slot shelf, 2-38
20-slot shelf, 2-36
6-slot shelf, 2-39
Electrical connector module
Electrical