Traverse Installation and Commissioning Guide, Section 12: Appendices
Timing and Management Cabling Checklist
Page 12-30
Turin Networks
Release TR3.2.1
Timing and
Management
Cabling
Checklist
Basic precautions for electrostatic discharge protection, electrical and fiber optic
cabling are provided in Section 6—
Precautions and Common Procedures
Chapter 1—“Precautions,” page 6-1. Cable management is provided in
Section 5—
Cable Management Specifications
All timing and management cabling detail-level procedure references are to
Section 9—
Alarm, Timing, and Management Cabling Procedures
. Required equipment
and tools are also provided as part of each cabling chapter.
.
Important:
Always wear a properly grounded ESD wrist strap when
making connections at the Traverse main backplane. Plug the ESD wrist
strap into the ESD jack provided on the air ramp or other confirmed source
of earth ground.
Table 12-10 Timing and Management Cabling Checklist
Step
Description and Procedure Reference
D
1
Connect T1/E1 or CC2M Timing Wires.
Connect input and
output timing wires from the central office BITS/SASE T1/E1 or
CC2M timing source to the Traverse main backplane T1/E1 or
CC2M wire-wrap posts.
Detail-level timing procedures are located in Chapter 2—“Timing
Interface Cabling”:
•
•
•
•
CC2M (2MHz) Timing Interface Output
2
Verify Jumpers on Main Backplane Headers J2 and J3.
The location of these jumpers is provided in Chapter 2—“Timing
Interface Cabling,”
Verify Preset Jumpers on Headers J2 and
3
Connect DCN Ethernet (Management) Cabling.
Connect
DCN Ethernet cabling from the LAN/WAN network device to the
Traverse main backplane J4 (ETHERNET) RJ-45 connector.
The detail-level DCN Ethernet interface connection procedure is
located in Chapter 3—“Management Interface Cabling,”