Release TR3.2.1
Turin Networks
Page 9-5
SECTION 9 ALARM, TIMING, AND MANAGEMENT CABLING PROCEDURES
Chapter 1
Alarm Interface Cabling
Introduction
For Traverse system alarm interface specifications, refer to Section 3—
and Management Interface Specifications
This chapter provides step-by-step instructions on how to connect visual, power, and
fuse alarm cables to a fuse alarm panel (e.g., PDAP-4S or PDAP-15A) and alarm
interface cables to the Traverse main backplane.
•
•
Visual Alarm Output Connections at the First Shelf
•
Visual Alarm Output Connections at the Next Shelf
•
Audible Alarm Output Connections at the First Shelf
•
Audible Alarm Output Connections at the Next Shelf
•
Optional Turin PDAP for Alarm Connections
The step-by-step instructions may be too detailed if you are experienced in CO
installations. In this case, scan the topic labels in the left margin for tasks to review or
refer to Appendix B—“Installation and Commissioning Checklists,”
Required
Equipment and
Tools
The following equipment and tools are required to complete system alarm cabling for
each Traverse shelf:
•
22 or 24 AWG (0.32 mm
2
) copper area wire
•
Flats or wire cutters
•
Wire-wrap tool for .045-inch x .045-inch (1.1 mm x 1.1 mm) posts
•
Electrostatic Discharge (ESD) wrist strap
•
(SDH network only) Two clamp-on ferrites (Turin part number 499-0135) per
alarm cable bundle (1 turn)