Traverse 2000 Installation into a 19-inch Rack
Introduction
For hardware installation overview and guidelines, refer first to Chapter 1—“Traverse
System Rack Installation Overview,” page 7-1.
This chapter provides the following information and procedures to complete a vertical-
and standard 5 inch (127 mm) forward-mount installation of the Traverse 2000 system
into a standard 7-foot (2133.6 mm) high, 19-inch (483 mm) wide telco rack.
•
Vertical Traverse 2000 Rack Configuration
•
Install the Horizontal Rack Adapter Brackets
•
Install the Front Inlet Fan Tray Holder in a 19-inch Rack
•