Traverse Installation and Commissioning Guide, Section 7: +Hardware Installation Procedures
Install a Traverse 2000 in a 19-inch Rack
Page 7-22
Turin Networks
Release TR3.2.1
Install a
Traverse 2000
in a 19-inch
Rack
Install the Traverse 2000 shelf in the central office bay and 19-inch (483 mm) rack
designated by your engineering work order using a minimum of six thread-forming
screws.
Important:
Install the first Traverse shelf below the Fuse Panel.
Table 7-10 Install a Traverse 2000 in a 19-inch Rack
Step
Procedure
1
Lift the Traverse 2000 shelf to its assigned rack vertical and standard
5 inch (127 mm) forward-mount position.
2
Align the shelf flange holes with the holes in the horizontal rack adapter
brackets (starting from the left, facing the rack front).
3
Place and partially tighten a thread-forming screw through the center
horizontal flange slot of the upper and lower shelf flanges. You will place
the remaining screws in a following step.
Figure 7-11 Rotated Traverse Shelf Flange Slots
4
Before completing the shelf installation, connect the power cable for the
front inlet fan tray holder to the Traverse backplane.
Grasp the power cable and bring it out the top of the front inlet fan tray
holder.
Mount with 3 fasteners per
flange (one being the
center horizontal flange
slot).