
Traverse Installation and Commissioning Guide, Section 1: Installation Overview
Installation Checklists
Page 1-2
Turin Networks
Release TR3.2.1
Installation
Checklists
See Appendix B—“Installation and Commissioning Checklists,” page 12-21 for a
quick reference on installation procedures.
Traverse Shelf
Interface
Specifications
Traverse shelf interface specifications are in the following sections:
•
Network Interface Specifications
•
Alarm, Timing, and Management Interface Specifications
•
Power Interface Specifications
•
Cable Management Specifications
7
Bring power cabling from the power
source (e.g., PDAP) to the back of
the shelf. Turn on power to the
shelf.
Power Installation and Cabling
8
Insert the active GCM card and
install a cable between the RS-232
DCE interface on the card and a PC
or laptop. Set up basic parameters,
using the CLI interface.
Alarm, Timing, and Management Interface
, Chapter 3—“Management Interface
Node Start-up and Commissioning
, Chapter 1—“Node Start-up and
9
Install other management interfaces
as needed (DCN and DTE).
Alarm, Timing, and Management Interface
, Chapter 3—“Management Interface
Table 1-1 Installation Process and References (continued)
Step
Procedure
Reference