Traverse Installation and Commissioning Guide, Section 12: Appendices
Node Start-up and Commissioning Checklist
Page 12-38
Turin Networks
Release TR3.2.1
11
Place the Remaining Cards.
Plan card placement for the Traverse shelf based on completed
network interface cabling and card placement recommendations
provided in Appendix A—“Card Placement Planning and
Guidelines,” page 12-1. Also refer to the following procedures in
Section 6—
Precautions and Common Procedures
Chapter 3—“Inserting and Removing Cards” for detailed
instructions:
•
Clean Cable and Card MPX Connectors
, page 6-16 if you
are placing optical cards
•
12
Place 1-slot Wide Blank Faceplates.
Place 1-slot wide blank faceplates in any empty Traverse card
cage slots to ensure EMI protection and proper cooling.
13
All Node Start-up and Commissioning Checklist steps are
complete.
Table 12-12 Node Start-up and Commissioning Checklist (continued)