Traverse Installation and Commissioning Guide, Section 9: Alarm, Timing, and Management Cabling Procedures
T1/E1 Timing Interface Output
Page 9-30
Turin Networks
Release TR3.2.1
T1/E1 Timing
Interface
Output
Follow these steps to complete T1/E1 timing interface primary and secondary
3
output
connections at the Traverse main backplane.
3
The secondary T1/E1 timing output connection is optional.
Important:
Always wear a properly grounded Electrostatic Discharge
(ESD) wrist strap when making connections to the Traverse main
backplane.
Table 9-16 T1/E1 Timing Interface Output Connections
Step
Procedure
1
Remove the back cover from the Traverse shelf. Refer to
Section 6—
Precautions and Common Procedures
Chapter 2—“Removing and Replacing Back Covers,” page 6-9 for
detailed instructions.
2
Strip back the insulation on the primary and secondary (optional) output
timing wires by ¼ inch (7 mm).
Note:
Two 2-pair wires are required for primary and secondary
(T1/E1_OUTA and T1/E1_OUTB) connections.