Traverse Installation and Commissioning Guide, Section 12: Appendices
Network Cabling Checklist
Page 12-26
Turin Networks
Release TR3.2.1
2
Complete Cabling.
Complete network cabling based on the
type of ECM installed.
Detail-level cabling procedures are in:
•
Chapter 3—“DS1 and E1 Cabling Procedures”:
–
DS1 (100 ohm) and E1 (120 ohm) Cabling at the
DS1/E1 ECM
–
E1 (75 ohm) Cabling at the Electrical Connector
Module
•
Chapter 4—“DS3 and E3 Cabling Procedures,”
Cabling at the Electrical Connector Module
•
Chapter 5—“Ethernet (Electrical) Cabling Procedures,”
Ethernet Protection Cabling at the Electrical Connector
Module
3
(SDH network only) Attach clamp-on ferrites around
10/100BaseTX cables.
Attach one clamp-on ferrite (1 turn) on
each 10/100BaseTX cable 152.4 mm (6-inches) from the 50-pin
connector.
4
Connect Fiber Optic Cables.
Connect fiber optic cables from
the central office optical distribution frame (ODF) or fiber optic
patch panel to the Traverse fiber optic backplane. Refer to
Section 2—
Network Interface Specifications
Optic Interface Cabling Specifications,” page 2-9 for
specifications.
The detail-level fiber optic cabling procedure is in
Chapter 2—“Fiber Optic Cabling Procedures,”
For information on acceptable minimum/maximum output power
and receiver levels refer to the Operations and Maintenance
Guide, Section 4—
, Chapter 2—“Traverse Transmit
5
All Network Cabling Checklist steps are complete.
Table 12-8 Network Cabling Checklist (continued)
Step
Description and Procedure Reference
D