Chapter 3 DS1 and E1 Cabling Procedures
E1 (75 ohm) Cabling at the Electrical Connector Module
Release TR3.2.1
Turin Networks
Page 8-25
4
Repeat Steps 1–6 for cabling at each E1 ECM.
5
Tie-wrap cables to the cable management bar following local procedures.
Important:
Mount a second cable management bar for strain relief with
Mini-SMB ECM cabling. Optionally, use a second cable management bar
for any copper cabling exiting the rear of the shelf.
Figure 8-14 Traverse Shelf with Cable Management Bar
6
Is an intermediate patch panel installed in an equipment rack for
termination of the cables?
•
Yes.
Route the cables to the intermediate patch panel located in the
same or adjacent rack per local procedures.
•
No.
Route the cables up the rack rails to the horizontal cable racks and
over to the central office cross-connect panel per local procedures.
7
Cut E1 cables to the correct length using diagonal cutters.
Important:
E1 coax cable length, from the Traverse shelf to the
intermediate patch panel or cross-connect panel, must not exceed 450 feet
(137 meters) to meet pulse template requirements.
8
Strip and terminate connectors on the cables using a coax stripping tool
and crimp tool.
9
Terminate Output (O) and Input (I) coax cables on intermediate patch
panel or central office cross-connect panel.
Table 8-9 E1 (75 ohm) ECM Cabling (continued)
Step
Procedure
Cable
Management
Bar
E1 Cables to
the Right Side