
Traverse Installation and Commissioning Guide, Section 11: Node Start-up and Commissioning Procedures
Power and Active/Standby LED Indicators
Page 11-12
Turin Networks
Release TR3.2.1
Power and
Active/Standby
LED Indicators
The LEDs in the following tables apply to all cards.
Table 11-9 Power and Active/Standby—All Cards
LED
RED
Amber
GREEN
OFF
Flashing
Solid
Flashing
Solid
Flashing
Solid
Power
Initialization
and diagnosis
is underway
but not
complete.
Hardware
failure
detected;
replace the
card.
N/A
N/A
N/A
Initialization is
complete and
the card is
operational.
No power.
Active/
Standby
N/A
N/A
The card is
unlocked and in
Standby mode.
1
Synchronization
with the Active
card is not
complete.
The card is
unlocked. The
card type does not
match the
provisioned card
type or the card is
placed in an
invalid slot.
2
The card is
unlocked and in
Standby mode.
Synchronization
with the Active
card is complete.
The Active
card is
unlocked and
operational.
The card is
locked or
initialization
is not
complete.
1
Does not apply to GbE or OC-N cards.
2
For the Traverse platform, refer to Appendix A—“Card Placement Planning and Guidelines,” page 12-1 for valid card placement
guidelines.