
Index
Release TR3.2.1
Turin Networks
Index-3
cabling
DS1/E1, 2-24
DS1/E1,Telco 64, 8-15
DS3/E3, 2-36
E1 Mini-SMB, 8-15
placement, 2-18
planning guidelines, 2-20
Telco 64 connector pinouts, 2-31, 2-32
Telco 64 connector pinouts, DS3 mapped, 2-32
types, 2-16
Electrostatic discharge
jack location, 6-7
precautions, 6-6
Environmental
alarm module, 3-2, 3-5
alarms, 3-2
precautions, 6-2
Equipment protection
module placement
1 for 1, 12-1
1 for 2, 12-1
1 for N, 12-1
Electrostatic discharge
Ethernet
100BaseT ECM (legacy) support, 2-50
cabling procedures, 8-37
combination cards, 2-44
dual-slot, 12-8, 12-12, 12-16
module placement, 12-8
protection, 2-44
protection ECM, 12-8
2-slot, 2-16
cabling procedures, 8-37
mapping, 2-45
mapping scheme, 2-45
placement, 2-45
port mapping, 2-46
Telco 50 pinouts, 2-46
unprotected with Ethernet (protection) ECM, 12-10,
Ethernet protection
F
Fail-safe
Fan
power interface specification, 4-5
tray holder
Ferrite
Fiber optic
cabling, 6-17, 6-18, 8-4, 8-8, 8-9
clean MPX connectors, 6-16
DCS application MPX port assignment, 2-13
patch panel, 2-3
port assignment, 2-7, 2-9, 4-5
shelf backplane, 2-3
testing, 8-13
Front
inlet fan tray holder
air filter installation, 6-27
power cabling, 7-11
rack installation, 7-11, 7-20
G
GbE
GCM
Ethernet interface pinouts, 3-14
list, 12-6
module placement, 12-8
redundancy rules, 12-6
RS-232 interface pinouts, 3-14
with VTX/VCX, 12-2
Grounding
front inlet fan tray holder, 7-3
PDAP and the shelf, 10-6
shelf, 7-3
H
Hardware
checklist
installation, power system, 12-22
installation checklist, 12-23
precautions, 6-2
Housing
I
Install
air ramp, 7-14
fan tray holder, 7-12
front inlet fan tray air filter, 6-27
front inlet fan tray holder, 7-11, 7-20
rack adaptation, 7-8
shelf, 7-9, 7-22
Installation
checklist