
Release TR3.2.1
Turin Networks
Page 8-27
SECTION 8NETWORK INTERFACE CABLING PROCEDURES
Chapter 4
DS3 and E3 Cabling Procedures
Introduction
For DS3/E3 electrical connector module (ECM) specifications, refer first to
Section 2—
Network Interface Specifications
, Chapter 4—“DS3 and E3 Interface
Cabling Specifications,” page 2-35 and Section 5—
Cable Management Specifications
Chapter 1—“Cable Management Specifications,” page 5-1.
This chapter provides the following installation procedures to complete cabling at the
Traverse main backplane using an DS3/E3 ECM.
•
•
Plug-in DS3/E3 Electrical Connector Module
•
DS3 and E3 Cabling at the Electrical Connector Module
•
The instructions may be too detailed if you are experienced in central office
installations. In this case, scan the topic labels in the left margin for tasks to review or
refer to Appendix B—“Installation and Commissioning Checklists,”