Traverse Installation and Commissioning Guide, Section 12: Appendices
Power Cabling Checklist
Page 12-32
Turin Networks
Release TR3.2.1
Power Cabling
Checklist
Basic precautions for electrostatic discharge protection, electrical and fiber optic
cabling are provided in Section 6—
Precautions and Common Procedures
Chapter 1—“Precautions,” page 6-1. Cable management is provided in
Section 5—
Cable Management Specifications
All power cabling detail-level procedure references are to Section 10—
Installation and Cabling Procedures
. Required equipment and tools are also provided
as part of each chapter.
.
WARNING!
Use extreme caution when working with battery and
battery return supply cables. Remove all metal jewelry when working
with power circuits.
Important:
Always wear a properly grounded ESD wrist strap when
making connections at the PDAP and Traverse main backplane. Plug the
ESD wrist strap into the ESD jack provided on the air ramp or other
confirmed source of earth ground.
Table 12-11 Power Cabling Checklist
Step
Description and Procedure Reference
D
1
Connect Battery and Battery Return Distribution
Cabling.
Connect battery and battery return distribution cabling
from the Traverse main backplane power terminals to the back of
the PDAP.
Detail-level battery distribution cabling procedures are located in
Chapter 3—“Battery and Battery Return Distribution”:
•
Connect PDAP-4S Battery Distribution Cables
•
Connect PDAP-4S Battery Return Distribution Cables
•
Connect PDAP-15A Battery Distribution Cables
•
Connect PDAP-15A Battery Return Distribution Cables
•