Chapter 3 Battery and Battery Return Distribution
Connect PDAP-15A Battery Return Distribution Cables
Release TR3.2.1
Turin Networks
Page 10-17
Connect
PDAP-15A
Battery Return
Distribution
Cables
The PDAP-15A distributes central office battery return (RETURN) to the Traverse 600
shelf.
Follow these steps to connect battery return distribution (RETURN) cables from a
Traverse shelf to the PDAP-15A.
10
Place the single-hole copper barrel cable lug on the battery "A"
distribution power terminal. Replace and tighten the screw.
11
Repeat Steps 1 through 10 for the battery "B" distribution cable
(i.e., connect the battery distribution (-48VDC) cable from the Traverse
shelf –48VDC_B power terminals to the position "B" distribution power
terminal on the PDAP-15A).
12
The Connect PDAP-15A Battery Distribution Cables procedure is
complete. Continue to the next procedure, Connect PDAP-15A Battery
Return Distribution Cables.
Table 10-5 Connect PDAP-15A Battery Distribution Cables (continued)
Step
Procedure
Table 10-6 Connect PDAP-15A Battery Return Distribution Cables
Step
Procedure
1
Did you first complete the
Connect PDAP-15A Battery Distribution
•
Yes.
Go to the next step.
•
No.
Go to Table 10-5 Connect PDAP-15A Battery Distribution
Cables, page 10-15 to complete this cabling first.
2
Use the supplied RETURN cable or use a crimping tool to attach a
single-hole copper barrel cable lug to one end of an the battery return
distribution (RETURN) wire for the battery return distribution cable
connection at the Traverse shelf.
3
Remove the SEMS screw from the RETURN_A power terminal.
4
Place the single-hole copper barrel cable lug on the battery return
distribution (RETURN) terminal. Replace and tighten the screw.