5
•
Installation
Page 58
Pumps C, Pumps F ( VC-Pxx, VF-Pxx)
Operating Manual
No.
Use for
1
Solvent tubing (up to three solvent lines)
2
Solvent tubing (up to three solvent lines)
3
Wash liquid tubing (seal wash, autosampler needle wash)
4
Detector waste line
Tubing brackets are available for holding the tubing in place. Slip the
bracket side onto the drain pipe.
Figure 9: Tubing bracket (left), tubing bracket installed (right)
Dual System Arrangements
The number of tubes may exceed the capacity that the tubing guides can
hold. In this case, it is recommended to place the solvent lines in the
tubing guides and route any additional tubes freely in the tubing chase.
Guide Holes and Capillary Clips
Guide holes and capillary clips are provided at specific positions on the
system modules. Route flow connections from one module to the next
module in the Vanquish system through the appropriate guide hole or
capillary clip when instructed to do so in the manual.
Summary of Contents for thermoscientific Vanquish Pumps C
Page 4: ...Contacting Us Page 4 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...
Page 30: ...2 Safety Page 30 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...
Page 40: ...3 Device Overview Page 40 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...
Page 196: ...7 Maintenance and Service Page 196 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...
Page 214: ...8 Troubleshooting Page 214 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...
Page 290: ...13 Appendix Page 290 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...