7
•
Maintenance and Service
Pumps C, Pumps F ( VC-Pxx, VF-Pxx)
Operating Manual
Page 189
5. Check the leak tray and drain port. If liquid is present, absorb the
liquid with a tissue.
6. Remove the device or slide-in module from the system stack as
required:
Install the carrying handles and remove the device from the
Vanquish system. Follow the instructions on dismounting the system
stack in the
Transporting or Shipping the System
section of the
Vanquish System Operating Manual
.
‑or‑
Remove the slide-in module from the device enclosure in the system
stack (see
Removing the Slide-In Module (
).
7.15.2 Transporting the Device to a New Location
Preparations
Prepare the device for transport. See
Preparing the Device for Transport
Follow these steps
1. Observe the notes for handling and lifting the device safely.
2. Transport the device to the new location.
3. Install and set up the device in the system stack. Follow the
instructions on mounting the system stack in the
Vanquish System
Operating Manual
.
4. Set up the device:
a) Connect the device and set up flow connections (see
b) Prepare the device for operation (see
5. Before starting an analysis, let the device equilibrate and be sure
that it is ready for operation.
Summary of Contents for thermoscientific Vanquish Pumps C
Page 4: ...Contacting Us Page 4 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...
Page 30: ...2 Safety Page 30 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...
Page 40: ...3 Device Overview Page 40 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...
Page 196: ...7 Maintenance and Service Page 196 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...
Page 214: ...8 Troubleshooting Page 214 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...
Page 290: ...13 Appendix Page 290 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...