7
•
Maintenance and Service
Page 142
Pumps C, Pumps F ( VC-Pxx, VF-Pxx)
Operating Manual
4.
Binary pump:
Connect the cable of the pressure sensor to the
P-
WORK
connector.
5. Dock the pistons either from the keypad or from the Chromeleon
software. Wait until docking is complete before proceeding with the
next step.
6. Flush the seal wash system with seal wash liquid (see
).
7. Purge the pump using the solvent of your application.
8. Inspect all flow connections on the pump head for indications of
leakage. Tighten leaky connections when the system pressure is
down to zero.
9. In the Chromeleon software, consider updating the Predictive
Performance information for the pump head components.
10.
Optional:
Test the system wash system and pump for leakage (see
Testing the Seal Wash System for Leakage (
the Pump for Leakage (General Test) (
).
11.
Recommended:
From the Chromeleon software, perform
performance qualification for the pump:
¨
Run the pump-specific
Performance Qualification
tests (PQ
tests) (= Flow Precision Test and Gradient Accuracy Test). For
details, refer to the
Operational and Performance Qualifications
manual
.
¨
When the tests are completed, execute the
QualificationDone
command.
Summary of Contents for thermoscientific Vanquish Pumps C
Page 4: ...Contacting Us Page 4 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...
Page 30: ...2 Safety Page 30 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...
Page 40: ...3 Device Overview Page 40 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...
Page 196: ...7 Maintenance and Service Page 196 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...
Page 214: ...8 Troubleshooting Page 214 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...
Page 290: ...13 Appendix Page 290 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...