
164
ADVIA 2400 Operator’s Guide
5.
Select
Re-Start
, then select
OK
.
6.
If possible, repeat the task that you were performing prior to the power failure and
verify that the data was stored.
7.
If reagent was dispensed, you must perform a Weekly WASH2 before resuming
operation.
Recovering from an unexpected power outage (after power returns,
when power was unexpectedly lost while system was on)
1.
If the Startup window is open, select
Shutdown
and perform the normal shutdown
operation.
2.
Turn off the workstation power and turn the
Operate/Standby
switch on the analyzer
to
Standby
.
3.
Wait approximately 20 seconds.
4.
Perform the normal startup operation and open the Startup window.
5.
At the Startup window, enter a password.
6.
Select
Re-Start
, then select
OK
.
7.
If possible, repeat the task prior to the power failure and verify that the data was
stored.
8.
If reagent was dispensed, you must perform a Weekly WASH2 before resuming
operation.
Summary of Contents for ADVIA 2400
Page 1: ...ADVIA 2400 Chemistry System Operator s Guide 073D0403 01 Rev A 2009 06 ...
Page 12: ...12 ADVIA 2400 Operator s Guide ...
Page 64: ...64 ADVIA 2400 Operator s Guide ...
Page 98: ...98 ADVIA 2400 Operator s Guide ...
Page 165: ...Maintenance 165 ...
Page 167: ...Troubleshooting 167 ...
Page 173: ...System Setup 173 ...
Page 177: ...System Setup 177 ...
Page 181: ...Appendix 181 ...
Page 182: ...182 ADVIA 2400 Operator s Guide ...