
Maintenance
147
10.
At the Operation Panel, select
Initialize
to return the probes back to home (over the
wash cups).
11.
At the Operation Panel, select
PRIME
,
then select
PRIME
2
,
then
Execute
to ensure
proper water flow through the probe.
NOTE:
Make sure that no water is leaking from the knurled fitting.
Replacing DPP probes equipped with crash detection
Materials required:
• Probes:
DPP
-equipped for crash detection
(REF 02030495, PN 073-0611-01)
• Phillips screwdriver
• Pliers
• Lint-free towels
Time: 10 minutes
Analyzer mode: STANDBY
BIOHAZARD
Wear personal protective equipment.
Use universal precautions.
1)
Dilution Probe (DPP)
2)
Sample Probe (SPP)
3)
Reagent Probe 1
(RPP1)
4)
Reagent Probe 2
(RPP2)
Figure 5-31. Dilution probe location
Removing the DPP probe
1.
Put the system in Standby mode.
CAUTION
Manually support the probe and be careful not to strike it against anything on the
analyzer, to avoid damaging the probe tip when the power is off.
2.
Cover the cuvettes, wash cups, and other analyzer surfaces with lint-free towels to
catch any screws that may fall.
3.
Lift and manually rotate the probe over the sample tray, either over the sample tray or
over the ISE.
4.
Loosen but do not remove the screws on each side of the probe cover.
Summary of Contents for ADVIA 2400
Page 1: ...ADVIA 2400 Chemistry System Operator s Guide 073D0403 01 Rev A 2009 06 ...
Page 12: ...12 ADVIA 2400 Operator s Guide ...
Page 64: ...64 ADVIA 2400 Operator s Guide ...
Page 98: ...98 ADVIA 2400 Operator s Guide ...
Page 165: ...Maintenance 165 ...
Page 167: ...Troubleshooting 167 ...
Page 173: ...System Setup 173 ...
Page 177: ...System Setup 177 ...
Page 181: ...Appendix 181 ...
Page 182: ...182 ADVIA 2400 Operator s Guide ...