
146
ADVIA 2400 Operator’s Guide
Install a new probe
1.
Slowly insert the new probe (
5
)
through the guide hole (
7
) until the flange (
8
) is
seated against terminal 1 (
6
).
2.
Verify that the probe is correctly positioned in terminal 2 (
1
) and the joint holder
(
2
).
3.
Tighten the setscrews while maintaining the probe position in terminal 2 and the joint
holder.
4.
Finger-tighten the joint connector.
1)
Terminal 2
2)
Joint Holder
3)
Joint Connector
4)
Probe Tube
5)
Terminal 1
6)
Guide Hole
7)
Flange
Figure 5-30. Installing new probe
CAUTION
To avoid damaging the threads or introducing leaks or air bubbles, do not cross
thread or force the knurled fitting in too far.
5.
Replace the probe-arm cover and tighten the two probe cover screws.
6.
Lift up the probe arm to the end of its travel. Manually rotate the probe over the
probe wash cup but not within the wash port.
7.
Put the system in Operating mode.
8.
At the
Menu Panel, select
Maint.
, then select
User maint.
In the Probe posi.adjust
area, select
Position adjust start
.
All probes (DPP, SPP, RPP1, and RPP2) move over cuvettes.
9.
Ensure that the probe is perpendicular to the arm and centered over the cuvette. If
not, call your local technical support provider or distributor.
Summary of Contents for ADVIA 2400
Page 1: ...ADVIA 2400 Chemistry System Operator s Guide 073D0403 01 Rev A 2009 06 ...
Page 12: ...12 ADVIA 2400 Operator s Guide ...
Page 64: ...64 ADVIA 2400 Operator s Guide ...
Page 98: ...98 ADVIA 2400 Operator s Guide ...
Page 165: ...Maintenance 165 ...
Page 167: ...Troubleshooting 167 ...
Page 173: ...System Setup 173 ...
Page 177: ...System Setup 177 ...
Page 181: ...Appendix 181 ...
Page 182: ...182 ADVIA 2400 Operator s Guide ...