
134
ADVIA 2400 Operator’s Guide
The lamp MUST be replaced:
•
quarterly
•
after approximately 2000 hours of use
•
if the system warns that lamp energy is out of range
•
if the Checking Lamp Energy procedure indicates the A–D points are outside the
±40 range of the scatter plot center line or the volts for any of the wavelengths
are outside the range of 5.0 to 9.0 volts
•
if the ATTENU(%) for any of the 14 wavelengths on the Lamp Check Energy
window falls below 80%
1)
Lead Wire Connector
2)
Lead Wire Connector
3)
Lamp Screws
4)
Lamp Plate
5)
Alignment Hole and Pin
Figure 5-20. Components of the lamp
1.
Set the analyzer to Standby.
2.
Lift and remove the access panel in front of the Rotating Reaction Tray to expose the
lamp housing.
WARNING
The lamp housing is
hot
. To avoid burns, allow it to cool down (approximately 10
minutes) before touching any components.
3.
Loosen the lead wire connectors (
1
and
2
), and remove the wires.
4.
Unfasten the lamp screws (
3
) on the plate (
4
) and remove the halogen lamp from the
housing.
CAUTION
Be careful not to drop the screws.
5.
When installing the new lamp, align the hole (
1
) to the locating pin (
2
).
Summary of Contents for ADVIA 2400
Page 1: ...ADVIA 2400 Chemistry System Operator s Guide 073D0403 01 Rev A 2009 06 ...
Page 12: ...12 ADVIA 2400 Operator s Guide ...
Page 64: ...64 ADVIA 2400 Operator s Guide ...
Page 98: ...98 ADVIA 2400 Operator s Guide ...
Page 165: ...Maintenance 165 ...
Page 167: ...Troubleshooting 167 ...
Page 173: ...System Setup 173 ...
Page 177: ...System Setup 177 ...
Page 181: ...Appendix 181 ...
Page 182: ...182 ADVIA 2400 Operator s Guide ...