
148
ADVIA 2400 Operator’s Guide
5.
Lift the cover off the probe arm.
1)
Probe
2)
Spring Clips
3)
Probe Wire Screw
4)
Joint Connector
5)
Probe Tubing
6)
Probe Guide
7)
Black Wire
8)
Wire Lock Screw
9)
Probe Arm
10)
Probe Wire Post
11)
Joint Holder (and Locking Screw)
Figure 5-32. DPP probe without cover
6.
Using pliers, if necessary, gently loosen the probe joint connector (4), then slide it
back on the tubing (5) approximately 1 cm.
7.
Gently flex and pull back on the tubing (
5
) to remove it from the end of the probe
body.
CAUTION
Be careful not to damage the flare end or kink the tube.
8.
Loosen but do not remove the locking screw (
11
).
9.
Loosen but do not remove the probe wire screw
(
3
), then remove the orange probe
wire from the post (
10
).
CAUTION
Do
not
force the wire or bend excessively, to avoid breaking the wire off of the probe
body mount.
10.
Securely hold the probe arm (
9
) and open the 2 spring clips (
2
) by grasping each at
the side closest to the black wire (
7
) going to the probe (
1
) and gently raising each to
an open, locked position.
CAUTION
There is some spring resistance when attempting to open the clips. Do
not
allow the
probe arm to swing side to side when opening the clips.
11.
Loosen but do not remove the wire lock screw (
8
).
Summary of Contents for ADVIA 2400
Page 1: ...ADVIA 2400 Chemistry System Operator s Guide 073D0403 01 Rev A 2009 06 ...
Page 12: ...12 ADVIA 2400 Operator s Guide ...
Page 64: ...64 ADVIA 2400 Operator s Guide ...
Page 98: ...98 ADVIA 2400 Operator s Guide ...
Page 165: ...Maintenance 165 ...
Page 167: ...Troubleshooting 167 ...
Page 173: ...System Setup 173 ...
Page 177: ...System Setup 177 ...
Page 181: ...Appendix 181 ...
Page 182: ...182 ADVIA 2400 Operator s Guide ...