Organization of This Manual
The following chart shows the sequence of the chapters to be read for details about each operation.
Chapter 1. Overview
Chapter 2.
Precautions for Use
Chapter 4. System configuration
Chapter 6.
Installation Conditions and
Method
Chapter 16. Specifications
(Chapters in this manual)
(Operation)
(Contents)
Chapter 5.
Part Name and Function
Chapter 6. Installation Conditions and
Method
Chapter 2.
Precautions for Use
Chapter 7.
Setting and Operation Outline
Chapter 11. Setting the Input/Output
Conditions
Chapter 13. Communication (General
Purpose Serial Interface)
Chapter 14. Computer link
Chapter 7. Setting and Operation Outline
Chapter 8. Run Menu Conditions and
Settings
Chapter 9. Setting the Condition of Each
Object Type
Chapter 10. PC functions
Chapter 12. Other Settings and Operation
Chapters 3, 7 to 12, 13, 14, and
Chapter 15. Troubleshooting
Chapter 15. Troubleshooting
- Review the system configuration (sys-
tem equipment, measurement items, in-
stallation requirements, etc.).
- Make connections, assemble, and
wire the system equipment (an IV-
S20, camera, peripheral equipment,
etc.)
- Run the software, and set the input/
output requirements (communication
requirements) with the externally con-
nected equipment.
- Run the software, and set the meas-
urement requirements. (set the meas-
urement/inspection areas, pass/fail
criterie)
- Perform an actual test using the re-
quirements you enterd.
7
Maintenance - Procedures for performing ordinary in-
spections.
- Set as necessary.
1
System
design
2
Installation/
assembly
3
Configuration
4
Measurement
condition
settings
5
Miscellaneous
settings
6
Test/
inspection