Operation
Bunker unloading
333 / 564
(54) End of bunker unloading
This key is used to switch bunker unloading OFF. The conveyors stop immediately, the
unload conveyor runs empty and swings into operating position.
The time taken for the unload conveyor to run empty can be adjusted in the menu
"Main settings", submenu "Bunker", line "Unload conveyor lag (sec)". If the value is
increased, the unload conveyor runs longer.
Bunker
Bunker auger delay (sec)
Unloading engine rpm pile
Unloading engine rpm lifting
Unloading stage 2 speed %
Start delay unloading stage 4
Unload elevator lag (sec)
Leaf-spreader speed by overloading
3
2
5
50
1300
5
850
3
6.19.2
Adjustment of unloading stage 2 cross conveyor speed
The speed of the cross conveyor can be adjusted in 10 % steps using the rotary wheel
(
45
). For this purpose,
ONLY AT unloading stage 2
press the rotary wheel and turn it
simultaneously. In this case the light bar in the display (
55
) is switched by pressing the
rotating switch and indicates the set cross conveyor speed.
As an alternative to pressing/turning the rotary wheel there is a 2nd speed adjustment
option of unload stage 2:
You can also adjust the speed in the menu "Main settings", submenu "Bunker", line
"Unloading stage 2 speed %".
Bunker
Bunker auger delay (sec)
Unloading engine rpm pile
Unloading engine rpm lifting
Unloading stage 2 speed %
Start delay unloading stage 4
Unload conveyor lag (sec)
Leaf-spreader speed by overload
50
2
Off
50
1300
5
850
3
Summary of Contents for Tiger 6
Page 3: ...Contents 3 564 Contents...
Page 4: ...Contents 4 564...
Page 13: ...Preface 13 564 1 Preface...
Page 14: ...Preface 14 564...
Page 22: ...Safety 22 564...
Page 23: ...Safety 23 564 2 Safety...
Page 24: ...Safety 24 564...
Page 41: ...General View and Specifications 41 564 3 General View and Specifications...
Page 42: ...General View and Specifications 42 564...
Page 53: ...General Description 53 564 4 General Description...
Page 54: ...General Description 54 564...
Page 57: ...Operating Components 57 564 5 Operating Components...
Page 58: ...Operating Components 58 564...
Page 98: ...Operation 98 564...
Page 99: ...Operation 99 564 6 Operation...
Page 100: ...Operation 100 564...
Page 226: ...Operation Defoliator 226 564 RIS defoliator RES defoliator...
Page 291: ...Operation Infeed conveyor 291 564 2 1 1 Infeed conveyor control block...
Page 299: ...Operation Strainer wheels turbines 299 564 4 Rpm strainer wheels...
Page 325: ...Operation Bunker unloading 325 564 6 19 Bunker unloading...
Page 361: ...Maintenance and Service 361 564 7 Maintenance and Service...
Page 362: ...Maintenance and Service 362 564...
Page 418: ...Maintenance and Service Defoliator 418 564 Defoliator in the maintenance position...
Page 475: ...Malfunction and Remedies 475 564 8 Malfunction and Remedies...
Page 476: ...Malfunction and Remedies 476 564...
Page 528: ...Lists Tables Plans Diagrams Maintenance Verification 528 564...
Page 558: ...558 564...
Page 559: ...Index 559 564 10 Index...
Page 560: ...Index 560 564...