RISO Inc. Technical Communications
us.riso.com
CHAPTER 6: PRESS SECTION
[ 6 - 6 ]
2. Removing the Pressure Lever:Spring & Pressure Lever;Cam
(1) Remove the main belt. (Refer to chapter 3)
(2) Unhook the follower spring.
(3) Loosen cap screws (M6x10: 2pcs), and remove the pressure;spring and pressure;cam from the pressure
shaft.
<< Precaution in Reassembly >>
Make sure to adjust the mounting position of the pressure lever;spring. (Refer to end of this chapter)
Pressure lever;spring
Pressure lever;cam
Pressure shaft
Follower spring
0605
Summary of Contents for RZ2xx Series
Page 16: ...RISO Inc Technical Communications us riso com CHAPTER 1 MAINTENANCE 1 14 MEMO ...
Page 36: ...RISO Inc Technical Communications us riso com 2 20 CHAPTER 2 MACHINE SUMMARY ...
Page 38: ...RISO Inc Technical Communications us riso com 2 22 CHAPTER 2 MACHINE SUMMARY MEMO ...
Page 52: ...RISO Inc Technical Communications us riso com CHAPTER 3 MAIN DRIVE 3 14 MEMO ...
Page 78: ...RISO Inc Technical Communications us riso com CHAPTER 4 FIRST PAPER FEED SECTION 4 26 MEMO ...
Page 98: ...RISO Inc Technical Communications us riso com CHAPTER 5 SECOND PAPER FEED SECTION 5 20 MEMO ...
Page 190: ...RISO Inc Technical Communications us riso com CHAPTER 10 MASTER REMOVAL SECTION 10 22 MEMO ...
Page 272: ...RISO Inc Technical Communications us riso com CHAPTER 14 MASTER MAKING SECTION 14 40 MEMO ...
Page 278: ...RISO Inc Technical Communications us riso com 15 6 CHAPTER 15 OTHER PRECAUTIONS MEMO ...
Page 312: ...RISO Inc Technical Communications us riso com CHAPTER 16 PANEL MESSAGE 16 34 MEMO ...
Page 360: ...RISO Inc Technical Communications us riso com CHAPTER 19 WIRING DIAGRAM RZ2 SERIES 19 14 MEMO ...
Page 374: ...RISO Inc Technical Communications us riso com ...