PAGE 22
OPERATOR’S MANUAL ULTRA GUIDANCE PSR ISO
CHAPTER
INSTALLATION OF SYSTEM COMPONENTS
3.6.
Installation RGS/GPS-Systems
Place the RGS 100 receiver with the magnetic foot on top of the
mounting plate on the vehicle. Place the RGS 320 receiver on to
the mounted bracket and tighten it.
After the GPS receiver is mounted, route the receiver cable and
connect it with X
19
on the cable harness X
B
and X
09
on the cable
harness X
A
(only with RGS-RTK).
Advice!
Pay attention when routing the cable that it does
not get exposed to sharp corners or edges to avoid
chafing. Also make sure it is free of mechanical loads
such as tension.
Attention!
Depending how the s
ystem is configured
by
authorized service, the GPS system could be under
constant electric load. This could slowly drain the vehicle
battery during lengthy interruptions of the operation. As
soon as the PSR iBox is removed from the vehicle, the
electric current to the GPS receiver is interrupted. If the
electric current of the GPS receiver comes through the
PSR iBox, the electricity to the GPS receiver is interrupted
as soon as the system is switched off. 20 to 30 minutes
of warm-up may be required when restarting.
3.7.
Removal of individual components
The de-installation of individual components follows in reverse
logical order as described in the installation directions.
Advice!
During disassembly make sure to properly close
plugs and receivers with provided blind covers.
Attention!
Connect the cable X
A
and X
B
to the blind
connectors on the bracket for the PSR-iBox and lock in
place with the safety slide.
Picture 15:
Reichhardt RGS 100 receiver
Picture 16:
Reichhardt RGS 320 receiver