IMPORTANT NOTES: Read First
www.playcraftsystems.com
For Customer Service Call
800.333.8519 (U.S.A.) or 541.955.9199 (International)
GRIP CLIMBER
INSTALLATION INSTRUCTIONS
Rev K
6/15/2021
1216
Page 1 of 5
Figure 1.2
Figure 1.1
See Footing Detail
See Installation Manual
Section 1309 Half Wall
(A)
Use liquid thread lock (such as Loctite
®
) with all threaded hardware.
Important:
Liquid thread lock (prior to
curing) helps to eliminate the common problem of "thread seizure" in stainless steel hardware by serving as a
lubricant during assembly.
(B)
Do not pour concrete until the equipment is completely assembled, leveled and plumbed. Concrete must be
allowed to cure completely before using the equipment (at least 72 hours).
(C)
Refer to Installation Manual for 1309 Half Wall assembly instructions.
(D)
Use appropriate compliant protective surfacing and adjust footing depths accordingly. See free publication -
The Handbook for Public Playground Safety, Publication #325 at www.CPSC.gov for the surfacing appropriate
for the fall height of the equipment or consult you surfacing supply representative.
NOTE
: R5 4' deck height shown.
Other configurations will vary slightly,
but does not affect the assembly.
FIGURE 1
Grip Climber
Summary of Contents for Farm Sound Panel Insert R5
Page 17: ......
Page 31: ......
Page 35: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 55: ......
Page 59: ......
Page 63: ......
Page 71: ......
Page 75: ......
Page 79: ......
Page 101: ......
Page 113: ......
Page 119: ......
Page 139: ......
Page 143: ......
Page 145: ......
Page 159: ......
Page 171: ......
Page 179: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 191: ......
Page 197: ......
Page 207: ......
Page 211: ......
Page 217: ......
Page 221: ......
Page 227: ......
Page 235: ......
Page 239: ......
Page 243: ......
Page 263: ......
Page 297: ......
Page 301: ......
Page 314: ...Playground Equipment Maintenance Guidelines Page 13 of 13 NOTES...