For Customer Service Call
800.333.8519 (U.S.A.) or
541.955.9199 (International)
Manufactured by Krauss Craft, Inc.
www.playcraftsystems.com
VERTICAL LADDER
INSTALLATION INSTRUCTIONS
Rev E
4/4/2013
1210
Page 2 of 3
2b Stone, drain rock
Concrete Footing
Blocking, see
Pea Gravel (for drainage)
Undisturbed Soil
Optional Filter Fabric over
Installers Manual
LOOSE FILL SURFACING MATERIAL SHOWN:
9" compressed or 12" uncompressed depth.
Compressed depth shown. (See Note D)
(Finish Grade)
(Top of Soil)
Footing Anchor
*
686mm
18"
457mm
27"
12"
305mm
9
13
16
"
249mm
4
3
16
"
107mm
See Section 06.1 of the Installation Manual.
Footing Detail
Step 1
Refer to Footing Layout and mark footing hole locations.
Dig (2) Ø 12" footing holes. Refer to Footing Detail for
depth and details.
IMPORTANT: For areas with soft soil conditions, larger
footings may be required. Additionally, half foot deck
heights will require 6" deeper footing holes.
* Footing depth must be adjusted to compensate for the
depth/thickness requirements of selected safety surfacing.
Top View - Footing Layout
Summary of Contents for Farm Sound Panel Insert R5
Page 17: ......
Page 31: ......
Page 35: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 55: ......
Page 59: ......
Page 63: ......
Page 71: ......
Page 75: ......
Page 79: ......
Page 101: ......
Page 113: ......
Page 119: ......
Page 139: ......
Page 143: ......
Page 145: ......
Page 159: ......
Page 171: ......
Page 179: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 191: ......
Page 197: ......
Page 207: ......
Page 211: ......
Page 217: ......
Page 221: ......
Page 227: ......
Page 235: ......
Page 239: ......
Page 243: ......
Page 263: ......
Page 297: ......
Page 301: ......
Page 314: ...Playground Equipment Maintenance Guidelines Page 13 of 13 NOTES...