www.playcraftsystems.com
For Customer Service Call
800.333.8519 (U.S.A.) or 541.955.9199 (International)
SPIRAL STEP CLIMBER R5
INSTALLATION INSTRUCTIONS
Rev E
12/19/2018
R5-1234
Page 2 of 4
12"
305mm
18"
457mm
26
3
16
" *
664mm
Optional Filter Fabric Over
Pea Gravel (for drainage)
Concrete Footing
Footing Anchor
Blocking, See
Installers Manual
2b Stone, drain rock
Undisturbed Soil
(Top of Soil)
(Finish Grade)
LOOSE FILL SURFACING MATERIAL SHOWN:
9" compressed or 12" uncompressed depth.
Compressed depth shown. (See Note D)
19
1
4
"
489mm
Footing Detail
Step 1
Refer to Footing Layout and mark footing hole location.
Dig (1) Ø 12" footing hole. Refer to Footing Detail for
depth and details.
IMPORTANT:
For areas with soft soil conditions, larger
footings may be required. Additionally, half foot deck
heights will require 6" deeper footing holes.
* Footing depth must be adjusted to compensate for the
depth/thickness requirements of selected safety
surfacing. See Section 06.1 of the Installation Manual.
Top View - Footing Layout
Summary of Contents for Farm Sound Panel Insert R5
Page 17: ......
Page 31: ......
Page 35: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 55: ......
Page 59: ......
Page 63: ......
Page 71: ......
Page 75: ......
Page 79: ......
Page 101: ......
Page 113: ......
Page 119: ......
Page 139: ......
Page 143: ......
Page 145: ......
Page 159: ......
Page 171: ......
Page 179: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 191: ......
Page 197: ......
Page 207: ......
Page 211: ......
Page 217: ......
Page 221: ......
Page 227: ......
Page 235: ......
Page 239: ......
Page 243: ......
Page 263: ......
Page 297: ......
Page 301: ......
Page 314: ...Playground Equipment Maintenance Guidelines Page 13 of 13 NOTES...