For Customer Service Call
800.333.8519 (U.S.A.) or
541.955.9199 (International)
Manufactured by Krauss Craft, Inc.
www.playcraftsystems.com
TRANSFER STATION
INSTALLATION INSTRUCTIONS
Rev Q
4/12/2012
1209
Page 4 of 7
Figure 1.3
3/8" x 2-1/2"
Button Head Bolt
3/8" x 1" O.D.
Washer
3/8" Lock Nut
ADA STEPS
TRANSFER RAIL
Figure 1.1
TRANSFER
LEG TOP
TRANSFER
DECK SUPPORT
1/4" x 3/4" Square Dr.
Tek Screw
FIGURE 3
3/8" x 1" O.D.
Washer
3/8" x 1-1/2"
Button Head Bolt
3/8" Lock Nut
3/8" x 1" O.D.
Washer
ADA STEPS
Figure 1.2
TRANSFER RAIL
Step 4
Place Transfer Rails into footing holes and attach
to collars as shown in Figure 1.2. (See Note C)
Step 5
Attach ADA Steps to Transfer Rails as shown
in Figure 1.3. (See Note A)
Step 6
Attach ADA Steps to deck as shown in Figure 3.
(See Note A)
Step 3
(Factory Assembled)
Attach Transfer Leg Top to Transfer Deck Support
as shown in Figure 1.1. (See Note A)
Summary of Contents for Farm Sound Panel Insert R5
Page 17: ......
Page 31: ......
Page 35: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 55: ......
Page 59: ......
Page 63: ......
Page 71: ......
Page 75: ......
Page 79: ......
Page 101: ......
Page 113: ......
Page 119: ......
Page 139: ......
Page 143: ......
Page 145: ......
Page 159: ......
Page 171: ......
Page 179: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 191: ......
Page 197: ......
Page 207: ......
Page 211: ......
Page 217: ......
Page 221: ......
Page 227: ......
Page 235: ......
Page 239: ......
Page 243: ......
Page 263: ......
Page 297: ......
Page 301: ......
Page 314: ...Playground Equipment Maintenance Guidelines Page 13 of 13 NOTES...